Kelvin builds two-phase cold plates that pull 40% more heat than water loops — drop-in for the GPU servers straining every datacenter.
Racks designed for 15kW now host 120kW of accelerators. Air is finished; single-phase water is at its ceiling.
of new AI datacenter capacity breaking ground by 2028 (IEA Electricity Report, 2025) — every megawatt saved on cooling is a megawatt sold as compute.
Two hyperscaler qualification programs entered Q2 2026 — 18-month cycles with 9-figure annual volumes at the end.
Five patent families on nucleation-site geometry — 3 years of boil physics.
Exclusive DC-volume terms with the only US maker of the dielectric blend.
9,000 hours of powered soak data operators require and rivals lack.
“We recovered 1.1 megawatts of cooling overhead in one hall. That is eleven more racks of H200s we can bill — Kelvin paid for itself before the second row.”
Thermal is qualified once and bought for a decade — the window to become the two-phase standard is the next 24 months.